VinBera2 Logo

BMW M3 COMPETI 2023

WBS33AY00PFN83510

WBS33AY00PFN83510_1 WBS33AY00PFN83510_2 WBS33AY00PFN83510_3 WBS33AY00PFN83510_4 WBS33AY00PFN83510_5 WBS33AY00PFN83510_6 WBS33AY00PFN83510_7 WBS33AY00PFN83510_8 WBS33AY00PFN83510_9 WBS33AY00PFN83510_10 WBS33AY00PFN83510_11 WBS33AY00PFN83510_12
Details
Final Bid: 58000
VIN WBS33AY00PFN83510
Year 2023
Odometer 1854 mi
Engine 3.0L 6
Gearbox AUTOMATIC
Drive train Rear-wheel drive
Color SILVER
Fuel GAS
Keys Yes
Information
Auction date 13-03-2023
Sale type Auction
Status Sold
Seller
Location RENTAL VEHICLE SALE
Damage Front End, Vandalism

BMW M3 COMPETI 2023

WBS33AY00PFN83510

Discover the auction opportunity for the BMW M3 COMPETI 2023 with VIN: WBS33AY00PFN83510. This vehicle is located in RENTAL VEHICLE SALE and is offered by n/a.

Our detailed vehicle report indicates that this SILVER BMW M3 COMPETI 2023 has sustained damage to the Front End, Vandalism.

With a mileage of 1854 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.

Don't miss your chance to bid on this BMW M3 COMPETI 2023 WBS33AY00PFN83510. Best of luck with your auction!

YOU MAY ALSO LIKE

WBA5A5C54ED501185
VIN: WBA5A5C54ED501185
Final Bid: 4925

BMW 5 SERIES 528I 2014

WBAJE7C54KWW19977
VIN: WBAJE7C54KWW19977
Final Bid: 10500

BMW 5 SERIES 540 XI 2019

WBA3B5C59EP543256
VIN: WBA3B5C59EP543256
Final Bid: 1825

BMW 328 XI SULEV 2014

3MW5R7J00L8B15708
VIN: 3MW5R7J00L8B15708
Final Bid: 11900

BMW 3 SERIES 330XI 2020