VinBera2 Logo

BMW M4 COMPETI 2024

WBS43AZ03RCN76347

WBS43AZ03RCN76347_1 WBS43AZ03RCN76347_2 WBS43AZ03RCN76347_3 WBS43AZ03RCN76347_4 WBS43AZ03RCN76347_5 WBS43AZ03RCN76347_6 WBS43AZ03RCN76347_7 WBS43AZ03RCN76347_8 WBS43AZ03RCN76347_9 WBS43AZ03RCN76347_10 WBS43AZ03RCN76347_11 WBS43AZ03RCN76347_12
Details
Final Bid: 17100
VIN WBS43AZ03RCN76347
Year 2024
Odometer 722 mi
Engine 3.0L 6
Gearbox AUTOMATIC
Drive train All wheel drive
Color GRAY
Fuel GAS
Keys No
Information
Auction date 22-08-2023
Sale type Auction
Status Sold
Seller
Location NY - NEWBURGH
Damage Stripped,

BMW M4 COMPETI 2024

WBS43AZ03RCN76347

Discover the auction opportunity for the BMW M4 COMPETI 2024 with VIN: WBS43AZ03RCN76347. This vehicle is located in NY - NEWBURGH and is offered by n/a.

Our detailed vehicle report indicates that this GRAY BMW M4 COMPETI 2024 has sustained damage to the Stripped, .

With a mileage of 722 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.

Don't miss your chance to bid on this BMW M4 COMPETI 2024 WBS43AZ03RCN76347. Best of luck with your auction!

YOU MAY ALSO LIKE

5YMJU0C04L9C89205
VIN: 5YMJU0C04L9C89205
Final Bid: 63250

BMW X5 M COMPETITION 2020

WBA7E2C57GG547008
VIN: WBA7E2C57GG547008
Final Bid: 10325

BMW 7 SERIES 740I 2016

WBA13AG02NCH74487
VIN: WBA13AG02NCH74487
Final Bid: 13975

BMW 5 SERIES 530E 2022

WBA5A5C58GG354144
VIN: WBA5A5C58GG354144
Final Bid: 5000

BMW 5 SERIES 528 I 2016