VinBera2 Logo

BMW M4 COMPETITION 2022

WBS43AZ02NCJ25615

WBS43AZ02NCJ25615_1 WBS43AZ02NCJ25615_2 WBS43AZ02NCJ25615_3 WBS43AZ02NCJ25615_4 WBS43AZ02NCJ25615_5 WBS43AZ02NCJ25615_6 WBS43AZ02NCJ25615_7 WBS43AZ02NCJ25615_8 WBS43AZ02NCJ25615_9 WBS43AZ02NCJ25615_10 WBS43AZ02NCJ25615_11
Details
Final Bid: 33300
VIN WBS43AZ02NCJ25615
Year 2022
Odometer 3679 mi
Engine 3.0L V6 N
Gearbox Unknown
Drive train All Wheel Drive
Color Black
Fuel Gasoline
Keys Yes
Information
Auction date 13-06-2022
Sale type Auction
Status Sold
Seller Progressive Casualty Insurance
Location Long Island (NY)
Damage All Over,

BMW M4 COMPETITION 2022

WBS43AZ02NCJ25615

Discover the auction opportunity for the BMW M4 COMPETITION 2022 with VIN: WBS43AZ02NCJ25615. This vehicle is located in Long Island (NY) and is offered by Progressive Casualty Insurance.

Our detailed vehicle report indicates that this Black BMW M4 COMPETITION 2022 has sustained damage to the All Over, .

With a mileage of 3679 mi, it features a 3.0L V6 N engine, an Unknown gearbox, and runs on Gasoline.

Don't miss your chance to bid on this BMW M4 COMPETITION 2022 WBS43AZ02NCJ25615. Best of luck with your auction!

YOU MAY ALSO LIKE

WBA2J7C59KVD61030
VIN: WBA2J7C59KVD61030
Final Bid: 11225

BMW 2 SERIES M240I XDRIVE 2019

WBA5R7C55KFH12340
VIN: WBA5R7C55KFH12340
Final Bid: 10400

BMW 3 SERIES 330XI 2019

5UXCR4C04LLE31113
VIN: 5UXCR4C04LLE31113
Final Bid: 31600

BMW X5 SDRIVE40I 2020

5UXCR6C50KLL22019
VIN: 5UXCR6C50KLL22019
Final Bid: 18400

BMW X5 XDRIVE4 2019